Refractory Monolithic Installation Installation and maintenance in Boiler 100 MW Unit 3 and Boiler 100 MW Unit 4 at PLTU Tarahan, Jl. Lintas Timur Sumatra No.Km. 15, Rangai Tri Tunggal, Kec. Katibung, South Lampung Regency
Refractory Monolithic Installation Project were carried out periodically in the following periods: